Foundation
Nothing about a tank forgives a bad base. The ring beam or slab has to be flat and true before the first panel goes anywhere near it, and a few millimetres out here is a leak later.

New tanks assembled on site. A single farm tank, or a multi-tank project with steelwork and civil works, our crews are doing this every week of the year.
Bolted steel is its own trade. It is not welded tank work with different bolts, and a crew who treat it that way leave you with a tank that weeps.
We put tanks up whoever supplied them. Bolted steel only, no welding on site, which is the whole reason bolted construction exists.
A single farm tank is a job. So is a multi-tank project with steelwork and civil works alongside it. The crews are doing both every week of the year.
Rafters, roof sheets and aluminium geodesic domes, set with the crane and fixed off.
Floor and wall liners fitted and sealed, for tanks that need one from the day they go up.
Ladders, caged access, platforms and handrail, so the tank can be reached and inspected once we are gone.
Christchurch based with crews working both islands. Distance is a logistics problem, not a reason to say no.
Four stages, in this order, every time. The order is not negotiable and neither is getting the first one right.

Nothing about a tank forgives a bad base. The ring beam or slab has to be flat and true before the first panel goes anywhere near it, and a few millimetres out here is a leak later.

Panels bolted up course by course with the seals seated as it goes. This is the stage that decides whether a tank holds, and it is the stage we get called back to fix on other people's work.

Rafters and sheets, or an aluminium dome, lifted in and fixed off. Most of this work happens on the crane, which makes it the part of a build that rewards a crew who have done it before.

Liner in and sealed, access steel on, and the site cleared. The tank gets handed over clean, which sounds like a small thing until you have been handed one that wasn't.
What changes between a fire water tank and an effluent tank is the liner, the fittings and the compliance around it. The steel gets the same treatment either way.
See the sectorsMost owners meet us at one of these four and find out about the rest later. You do not need us to have built a tank to get us to look at it.
Leak diagnosis, panel and seal replacement, structural repair. Any brand of bolted tank, whoever put it up.
Read more 03Liner replacement, internal cleaning and scheduled servicing that keeps a tank watertight and compliant.
Read more 04End of life tanks taken down safely. Materials cleared, site left tidy and ready for whatever comes next.
Read more
Contact us today to see how our team can assist with your requirements.