A failed liner at a distillery, replaced before it cost anyone product.

A waste water tank at a wine distillery site whose liner had reached the end of its service life, the old membrane split and holding sludge rather than product. The tank was emptied, the old liner cut out and removed, and the shell and fittings cleaned back to sound steel before a new liner went in and the outlet and pipework were refitted.

Sector
Wine industry
Location
Hawkes Bay
Capacity
400,000 litres
On site
1 week
Repair & Refurbishment in full

Hawkes Bay. Marker position is indicative.

The same tank, before and after

The shell stripped back and cleaned, then relined. Both photographs are of this tank, taken from roughly the same place inside it.

  • The inside wall of the tank stripped back to bare panels, water staining running down the plates, the rim open to an overcast sky
    Before
  • The same wall covered in new black liner, floor lined to the wall, the rim open to the same sky
    After
Reinforcing steel laid for a tank foundation at sunset, crew working

Begin with a call

Tell us what the tank is doing and roughly where it is. Every job is quoted on its own, so the first step is a phone call.

Required

Form not connected yet: Web3Forms key pending

Until it is wired up, calling is the fast path.

Call +64 21 263 6697
Top